itmathics.

How we work

At the start of a project we agree the role of our team against the brief, the competencies of everyone involved and the requirements of the documentation.

Task first. Technology second.

On project work the specification is the result of the analysis, not its starting point. We study the site, the requirements, the existing infrastructure and how it will actually be used, and we check technical constraints and compatibility. Installation, configuration, integration, operation and service are taken into account while the solution is still being designed.

Three ways we take part

The role is agreed at the start, not along the way.

Supply to specification

Selecting available items and permitted equivalents, procurement, logistics and handover of the equipment.

Project participation

Analysis of the task and an agreed scope of work: design, supply, installation, configuration, integration and testing.

Together with partners

For cloud, hybrid and other specialised tasks we form a project team with specialist partners and assign responsibility in advance.

Five stages of work

  1. Analyse

    The site, the requirements, the constraints, the documentation and the infrastructure already in place.

  2. Design

    The technical solution and the make-up of the equipment and systems.

  3. Equip and implement

    Supply, installation, connection, configuration, integration.

  4. Test and hand over

    Testing and putting the system into operation.

  5. Support

    Agreed service work, technical support and upgrades after launch.

Outcome

Supply becomes part of one continuous piece of work - from preparing the solution to launch and support.

What we do ourselves, and what we do with partners

On our own

Our own ground is local infrastructure: workplaces, networks, storage and backup, server systems, meeting rooms, video surveillance and access control.

With partners

For cloud and hybrid scenarios we bring in specialist partners and divide responsibility in advance.

Own hosting, colocation, delivering a full cloud project single-handed and general construction are not part of what we do.

On what terms

What the project price includes, and what is paid for separately.

Warranty

The standard warranty on supplied equipment is one year.

Installation and configuration

Included in the project cost by agreement.

After launch

Subsequent servicing and replacement are paid options.

Support priority

Goes to clients who bought the solution from us. Third-party equipment - after diagnostics and agreement.

Service, warranty and support

Tenders and procurement documentation

We run projects for government organisations through procurement portals and the buyer's own procedures, working to the requirements of the tender documentation.

Scope of involvement

Depending on the project we take on design, solution selection, supply, implementation, configuration and service.

Working to a specification

Selecting available items and permitted equivalents, procurement, logistics and handover of the equipment.

TermsEquivalent

What our processes are certified against

The company's processes are certified to five current ISO standards.

ISO 9001
Quality
ISO 14001
Environmental management
ISO 27001
Information security
ISO 45001
Occupational health and safety
ISO 50001
Energy management

Driving your digital future with itmathics

We are open to dialogue and want to demonstrate our capabilities. Contact us for presentations of our products.